Anchor — the Plan Is
the Source of Truth

TypeWeb app · project management
StackSingle HTML file · React
AIDrafts · a person signs off
StatusIn testing · no public link yet

// the idea

Most of a producer's week is translation.

The plan says one thing. The client needs to hear it one way, the executive another, the dev team a third. The status report is a rewrite of the schedule. The risk register is a rewrite of what everyone already suspects. Each rewrite is a chance for the story and the plan to drift apart.

Anchor keeps a single plan and derives everything else from it. Each project carries its own context: brief, team, rates, phase. Change a task and the finish date, the burn-down, the allocation heatmap, the risk list and the next status update all move together.

The board. Every card comes from the plan. Click any screenshot to enlarge.
AI drafts

Briefs, schedules, budgets, risk registers, status digests and replies are drafted from the project's own context. Drafts are marked in teal and labelled for review.

A person decides

A draft joins the project when someone accepts it. Acceptance and sign-off are marked in gold, so it is clear which words a human stood behind.

Assumptions stay visible

Where the brief is silent, the draft says so. Guesses are tagged [ASSUMED], logged, and counted as risk until confirmed.

01Scope 02Plan 03Board 04Respond 05Updates 06Artefacts

// 01 · scope, brief and context

Context that feeds every draft

Each project starts with its phase (Intake through to Hypercare), a brief and working notes: who the stakeholders are, which dates are immovable, where the unknowns sit. That context is passed to everything Anchor drafts later, which is why a reply written in week eight still knows who the sponsor is.

A

Briefs as reusable documents

Upload, paste, or generate one from notes. Accepts .txt, .md, .docx and text-based PDF. A client brief becomes a creative brief in one step, with PDF and Word export.

B

Named team

People are given roles, then assigned to tasks, so load is tracked per person and not just per discipline.

C

Rate card

Day rate and hours per day for each role, in dollars, pounds or euros. The card belongs to the project; it can be imported, or saved as the default for future projects. The budget is calculated from it.

Projects. One card per project.
Project context. Phase, brief, notes, briefs.
Team and rate card.

// 02 · plan

A schedule that tells you where it will break

The plan is versioned. It opens on a baseline with its finish date and milestone status, followed by the Gantt: gold bars are the critical path, teal bars are everything else, and a dot marks any task the risk read has flagged.

Below the schedule is the part a static Gantt never gives you: a predictive risk read. Each task is scored on plain, checkable reasons, such as being on the critical path, depending on something unconfirmed, or belonging to someone who is over-allocated that week.

predictive riskwhat's most exposed right now
HIGH    Chat backend & session service
        on the critical path — any slip moves the finish date
        Devin Park is over-allocated (320%) in W50
MEDIUM  Discovery review & sign-off
        on the critical path — any slip moves the finish date
        depends on "Content model & migration audit [ASSUMED scope]", which is unconfirmed

totals  4 high · 14 medium · 2 low
Scenario sandbox

Try a change without committing it: scale a task's effort, add a resource, drop a task, shift the start, or scale everything.

Burn-down

Effort-days and budget remaining, each plotted against the ideal line.

Resourcing and budget

Hours, days, rate and cost by role, totalled. Below it, a weekly heatmap per person: each cell is a percentage of a five-day week, and anything over 100% turns red.

Record a change

Log a slipped or cut task and re-plan. That creates a new version, so the baseline is never overwritten.

The schedule, the budget and a full project pack export as CSV, PDF or Word.

Current plan and schedule. Baseline, milestones and the Gantt.
Predictive risk. Ranked, with reasons.
Sandbox and burn-down.
Allocation, export, re-plan.

// 03 · board

The same tasks, as work in motion

The board is a second view of the same plan. Cards sit in To Do, In Progress, Blocked and Done, carrying task type, phase, owner and a critical-path marker. Filter by type or by person.

Done is not the same as signed off. Finished work can carry an explicit sign-off, and the header counts the two separately. Blocked is a column, so a blocker is visible to everyone instead of sitting in someone's inbox.

Board. Gold marks critical-path cards and human sign-off.

// 04 · respond

Something went wrong. Now what do you say?

Describe a situation, risk or blocker in a sentence or two and choose who needs to hear about it: client, stakeholder, executive, dev team, QA, design or strategy. Each audience has its own register. For a client that means external, warm and confident, with one clear ask.

Anchor first gives you the read: what the situation means for this project, a short list of options with the trade-off of each, and a recommended play. Then it drafts the message.

A

Options before words

You see the choices and what each one costs before any message is written.

B

One situation, different messages

The client hears the ask and the deadline. The designer hears what to hold and what to keep moving.

C

It doesn't invent facts

Missing names and dates are left as marked placeholders for you to fill in.

D

It shows its sources

Each read lists the project context and briefs that informed it, and draws on earlier, similar situations as precedents. Then copy, redraft or accept.

The read. Options, each with its trade-off.
Client draft. Recommended play, then the message.
Stakeholder draft. Same facts, more direct.
Design draft. Internal, practical, specific.

// 05 · updates

Status reports written from the plan

The status digest turns the live plan into an update for a chosen audience: what is progressing, what is at risk, and the one thing you need from the reader. It reads from the current schedule and risk read, so it can't describe a project healthier than the one on the Plan tab.

Meeting notes → plan runs the other way. Paste notes from a call and Anchor reads them against the current plan and pulls out what changes: tasks to add, drop or re-estimate, plus new risks and the decisions captured.

Status digest. Progress, risk, one ask.
Meeting notes → plan. Notes in, changes out.

// 06 · artefacts

The documents a project needs, in order

Four artefacts, each built from the one before it, so the chain from brief to risk stays intact:

artefactseach feeds the next
brief    → work breakdown   phase / deliverable / task
tasks    → schedule         dated plan + Mermaid Gantt
schedule → budget           costed estimate + scenarios
plan     → risk register    scored risks + mitigations

A drafted schedule opens with its assumptions log. If the brief never gave a start date, the draft says so and flags the one it chose. Accept a draft and it becomes part of the project. Redraft and it tries again.

Anchor has dark and light themes. Both are shown here.

Artefacts, dark. Schedule and assumptions.
Artefacts, light. The same view.

// status

In testing

Anchor Project Manager is a single-file React app from Wyse Labs. It is in testing ahead of release. The screenshots on this page use the built-in example project: a fictional client, team and CMS build.

Build
Testing
Sections
6 per project
Exports
CSV · PDF · Word
Themes
Dark · light
Not yet public

There is no public link yet. This page will be updated when there is.